LiveTrafik
RoadworksCritical

US 6 in both directions (Mile Point 34.04 - 30.61): Utility work.

US 6 in both directions: Between N 400 E and Coulter Rd.

Advertisement
...

Between N 400 E (3 miles west of the Westville area) and Coulter Rd (Westville). Utility work is in progress. A lane is closed. Look out for flaggers. All lanes are slow in both directions of travel. Until October 23, 2026 at about 4:00PM CDT.

ReportedSeptember 16, 2026 at 06:00 AM PDTOctober 23, 2026 at 02:00 PM PDT
Road
US 6
Source
INDOT
Coordinates
41.54907, -86.98540

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 6

🚧 Roadworks
US 6 in both directions (Mile Point 34.04 - 30.61): Utility work. | LiveTrafik