LiveTrafik
RoadworksModerate

US 18 in both directions: Road construction.

US 18 in both directions: Between County Road M44 and US 71.

Advertisement
...

Between County Road M44 and US 71 (Spencer). Road construction work is in progress. The roadway is shared with opposing traffic. There is a width limit in effect . Width limit 12'0" . Until October 22, 2026 at about 2:00PM CDT. Full schedule below: β€’ September 8, 7:00AM - October 22, 2:00PM Comment: Cherokee RCE (712-225-5786) - Clay County

ReportedSeptember 8, 2026 at 05:00 AM PDTOctober 22, 2026 at 12:00 PM PDT
Road
US 18
Source
Iowa DOT
Coordinates
43.18334, -95.15023

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 18

🚧 Roadworks