LiveTrafik
RoadworksModerate

US 61 in both directions: Road construction.

US 61 in both directions: Between IA 38 and County Road Y48.

Advertisement
...

Between IA 38 (Muscatine) and County Road Y48 (Blue Grass). Road construction work is in progress. A lane is closed intermittently. Until September 29, 2026 at about 1:00PM CDT. Full schedule below: β€’ September 8, 7:00AM - September 29, 1:00PM Comment: Fairfield RCE (641-469-4090) - Muscatine County

ReportedSeptember 8, 2026 at 05:00 AM PDTSeptember 29, 2026 at 11:00 AM PDT
Road
US 61
Source
Iowa DOT
Coordinates
41.45886, -91.01843

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 61

🚧 Roadworks