RoadworksSevere
SH-37 β Construction
SL0564 to SL0564
Advertisement
...
- Daytime closure only. - Delays due to slow moving road repair operations. - Watch for flag personnel directing traffic. Construction consisting of widening roadway to install continuous two way left turn lane
ReportedSeptember 18, 2026 at 06:32 AM PDTSeptember 18, 2026 at 04:00 PM PDT
Road
SH-37
Source
state DOT open data
Coordinates
32.69508, -95.48549
Roadworks details
Direction
southbound