RoadworksModerate
US-83 β Construction
FM2404 to IH0020
...
- Frontage road only, main lanes are open. - Watch for flag personnel directing traffic. Watch for workers and equipment as construction of a new entrance ramp from the SB frontage road (N. Clack St.) to the US 83/277 SB main lanes begins.
ReportedSeptember 3, 2026 at 06:32 AM PDTOctober 30, 2026 at 03:00 PM PDT
Road
US-83
Source
state DOT open data
Coordinates
32.48745, -99.76615
Roadworks details
Direction
southbound