LiveTrafik
RoadworksModerate

IN 2 (Mile Point 1.4 - 3.44): Construction work.

IN 2: Between Calumet Ave and US 41.

Advertisement
...

Between Calumet Ave and US 41. Look out for construction work. Until September 25, 2026 at about 3:00PM CDT. Comment: SR 2 from IL State Line to S. Jct of US 41 Pavement coring along SR 2 for network level coring requirements. Lane restrictions will start on 09/02/26 8am to 9/25/2026/3pm Permit number T0000219153

ReportedSeptember 2, 2026 at 06:00 AM PDTSeptember 25, 2026 at 01:00 PM PDT
Road
IN 2
Source
INDOT
Coordinates
41.23957, -87.50277

Roadworks details

Direction
NOT_DIRECTIONAL

More about IN 2

🚧 Roadworks