RoadworksMinor
US 191
...
ALERT: Expect pilot car operations Monday through Saturday between the summit (MP 267) and milepost 269 with up to 25 minute delays. Crews are installing guardrail and preparing for a winter shut-down.
ReportedJuly 12, 2026 at 05:00 PM PDTNovember 26, 2026 at 04:00 PM PST
Road
US 191
Source
UDOT
Coordinates
39.88874, -110.74998