RoadworksModerate
Road Work - Planned on S.R. 747 Resurfacing
S.R. 747 Resurfacing northbound.
...
A resurfacing project on S.R. 747, between Crescentville Road and Brate Drive. Paving operations will begin after pavement and curb ramp repairs. Throughout the project, traffic will be maintained in a minimum of one, 12-foot lane in either direction.
ReportedApril 20, 2026 at 04:00 AM PDTSeptember 5, 2026 at 04:00 PM PDT
Road
S.R. 747 Resurfacing
Source
ODOT
Coordinates
39.33194, -84.46306
Roadworks details
Direction
northbound