RoadworksModerate

Construction on 5

5 at milepost 69.5

...

Beginning Monday, April 27, until further notice: Weeknights, from 6:30 p.m. to 6 a.m., and Saturdays until 8 a.m., single-lane, double-lane and shoulder closures will be in place along both directions of I-5 at the following bridges: •Newaukum River Bridge south of Rush Road (milepost 72.23) •I-5 northbound over railroad tracks (mileposts 77.11 to 77.51) •Dillenbaugh Creek Bridge (milepost 77.84) •Salzer Creek Bridge north of Chamber of Commerce Way (milepost 80.21)

SinceApril 27, 2026 at 12:00 PM PDTOngoing
Road
005
Source
WSDOT
Coordinates
46.56326, -122.87650

Roadworks details

Direction
B
🚧 Roadworks
Construction on 5 | LiveTrafik