LiveTrafik
RoadworksModerate

Construction on 508

508 at milepost 28.4

...

Monday, July 6 through Wednesday, Sept. 30: Travelers on SR 508 near the Tilton River and Mossywood Road (mileposts 28 to 29) will take turns using one open lane through the work zone, controlled by a temporary traffic signal 24/7. Crews are installing an engineered log jam to help protect the highway from erosion. At times, flaggers will direct traffic. Expect delays of up to 20 minutes.

ReportedJuly 6, 2026 at 06:00 AM PDTSeptember 30, 2026 at 01:34 PM PDT
Road
508
Source
WSDOT
Coordinates
46.58435, -122.35067

Roadworks details

Direction
B
🚧 Roadworks
Construction on 508 | LiveTrafik