RoadworksSevere
I-80 in both directions: Construction work.
I-80 in both directions: Between MM 229 and MM 232.
...
Between MM 229 and MM 232 (5 to 6 miles west of the Lexington area). Look out for construction work. Left lane closed in both directions of travel. Comment: Head to head traffic Cozad to Darr.
ReportedMarch 25, 2026 at 10:00 AM PDTJanuary 24, 2030 at 03:05 AM PST
Road
I-80
Source
NDOT
Coordinates
40.78493, -99.85412
Roadworks details
Direction
BOTH_DIRECTIONS