RoadworksSevere
US 275 in both directions: Construction work.
US 275 in both directions: Between 565th Road and 574th Avenue.
...
Between 565th Road (8 miles east of the Norfolk area) and 574th Avenue (6 miles west of the Wisner area). Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Until December 31, 2026 at about 12:00AM CDT. Comment: U.S. Highway 275 (US 275). Work includes grading, culverts, paving and bridge construction on the 12 mile section of roadway. Anticipated completion is Dec. 2027.
ReportedMarch 30, 2026 at 02:52 PM PDTDecember 30, 2026 at 10:00 PM PST
Road
US 275
Source
NDOT
Coordinates
42.01844, -97.21593
Roadworks details
Direction
BOTH_DIRECTIONS