RoadworksSevere
NE 4 in both directions: Bridge construction.
NE 4 in both directions: Between 75 RD; Southwest 75 Road and Oates Road.
...
Between 75 RD; Southwest 75 Road and Oates Road (1 mile west of the Beatrice area). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. Width limit 10'0" . Comment: Work includes bridge removal and replacement. Traffic will be maintained with traffic signals. A 10-foot width restriction will be in effect.
ReportedMarch 30, 2026 at 01:56 PM PDTMarch 2, 2030 at 05:01 AM PST
Road
NE 4
Source
NDOT
Coordinates
40.28318, -96.80111
Roadworks details
Direction
BOTH_DIRECTIONS