RoadworksSevere
US 275 in both directions: Construction work.
US 275 in both directions: Between 5th Street North and North Mill Street.
...
Between 5th Street North (Wisner) and North Mill Street (2 miles west of the West Point area). Look out for construction work. A lane is closed intermittently. Comment: 4 Lane Expressway/Grading-Culv-Bridge Work
ReportedMarch 30, 2026 at 08:00 AM PDTJanuary 17, 2030 at 01:23 PM PST
Road
US 275
Source
NDOT
Coordinates
41.98346, -96.90808
Roadworks details
Direction
BOTH_DIRECTIONS