LiveTrafik
RoadworksSevere

US 30 in both directions: Road maintenance operations.

US 30 in both directions: Between County Road 2 and Road 3.

...

Between County Road 2 and Road 3 (near Richland). Road maintenance work is in progress. There are alternating lane closures. Portable traffic signals in use. Until September 30, 2026 at about 6:00PM CDT. Comment: Work includes installation of CCTV towers and cameras, electrical conduit and related electrical installations, and seeding operations. Traffic will be maintained with temporary traffic control devices throughout construction. Anticipated to be completed Sept. 2026.

ReportedJuly 6, 2026 at 05:00 AM PDTSeptember 30, 2026 at 04:00 PM PDT
Road
US 30
Source
NDOT
Coordinates
41.44309, -97.21833

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 30 in both directions: Road maintenance operations. | LiveTrafik