LiveTrafik
RoadworksSevere

US 275 in both directions: Bridge construction.

US 275 in both directions: Between South 72nd Street and South 67th Street.

Advertisement
...

Between South 72nd Street and South 67th Street (Omaha). Bridge construction work is in progress. There is head to head traffic on the roadway. See map for detour(s). Comment: 72nd St traffic will be reconfigured to head-to-head traffic in the NB lanes starting Wednesday, Jan. 7 More Info: Screenshot 2026-08-18 131021.png

ReportedMarch 30, 2026 at 01:03 PM PDTJune 7, 2030 at 08:30 AM PDT
Road
US 275
Source
NDOT
Coordinates
41.21245, -96.02322

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 275

🚧 Roadworks