RoadworksSevere
NE 57 in both directions: Construction work.
NE 57 in both directions: At NE 59.
...
At NE 59 (2 miles south of the Coleridge area). Look out for construction work. There are alternating lane closures. Portable traffic signals in use. Comment: CCTV camera tower construction and camera installation
ReportedJuly 6, 2026 at 06:00 AM PDTApril 25, 2030 at 03:20 AM PDT
Road
NE 57
Source
NDOT
Coordinates
42.46736, -97.21106
Roadworks details
Direction
BOTH_DIRECTIONS