RoadworksSevere
US 75 in both directions: Construction work.
US 75 in both directions: Between Donald Street and US 77.
...
Between Donald Street (Macy) and US 77 (Winnebago). Look out for construction work. The roadway is reduced to one lane. Portable traffic signals in use. A pilot car is in operation. Look out for a flagging operation. Comment: Culvert construction
ReportedMarch 30, 2026 at 05:25 PM PDTMay 20, 2030 at 09:31 AM PDT
Road
US 75
Source
NDOT
Coordinates
42.11519, -96.35142
Roadworks details
Direction
BOTH_DIRECTIONS