RoadworksSevere
NE 12 in both directions: Bridge construction.
NE 12 in both directions: Between NE 9 and 110th Street.
...
Between NE 9 and 110th Street (1 to 2 miles east of the Ponca area). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. Width limit 12'0" . Comment: Weather permitting work includes bridge repair and culvert work
ReportedMarch 23, 2026 at 06:00 AM PDTJanuary 17, 2030 at 01:16 PM PST
Road
NE 12
Source
NDOT
Coordinates
42.53358, -96.69895
Roadworks details
Direction
BOTH_DIRECTIONS