RoadworksSevere
NE 250 in both directions: Construction work.
NE 250 in both directions: Between NE 2 and MM 28.
...
Between NE 2 and MM 28 (21 to 48 miles south of the Rushville area). Look out for construction work. A lane is closed intermittently. Look out for a flagging operation. A pilot car is in operation. Width limit 12'0" . Comment: Work includes Grading, Paving, Seeding, and Culvert
ReportedMarch 30, 2026 at 03:33 PM PDTJanuary 21, 2030 at 03:49 AM PST
Road
NE 250
Source
NDOT
Coordinates
42.05471, -102.42439
Roadworks details
Direction
BOTH_DIRECTIONS