LiveTrafik
RoadworksSevere

NE 71 in both directions: Construction work.

NE 71 in both directions: Between County Road 26 and Schleicher Road.

...

Between County Road 26 and Schleicher Road (9 to 17 miles south of the Gering area). Look out for construction work. There are alternating lane closures. Width limit 13'0" . Comment: Weather permitting, work will begin May 4 on Nebraska Highway 71 (N-71) north and south, from reference post 39.90 to reference post 47.66 according to the Nebraska Department of Transportation. Paulsen, Inc., of Cozad, is the contractor for this project. Work includes pavement repair, milling old asphalt and repaving with a new asphalt overlay, bridge repairs, new guardrail and grading. Traffic will be maintained with lane closures. A 13-foot width restriction will be in effect for bridge work and paving. Anticipated completion is Sept. 2026.

ReportedMay 4, 2026 at 04:00 AM PDTFebruary 21, 2030 at 12:20 AM PST
Road
NE 71
Source
NDOT
Coordinates
41.56835, -103.67666

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
NE 71 in both directions: Construction work. | LiveTrafik