RoadworksSevere

US 26 in both directions: Construction work.

US 26 in both directions: Between Main Street and US-26 to US-385 Link.

...

Between Main Street (near Minatare) and US-26 to US-385 Link (3 miles west of the Bayard area). Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Comment: The work on this project is the next phase of the 4-lane Heartland Expressway. Work includes grading, concrete pavement, culverts, bridge construction, lighting, guardrail and seeding. More Info: 20260526-D5-51521A.pdf

ReportedJune 8, 2026 at 05:00 AM PDTMarch 28, 2030 at 02:20 AM PDT
Road
US 26
Source
NDOT
Coordinates
41.81548, -103.50036

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 26

🚧 Roadworks