RoadworksSevere
NE 92 in both directions: Construction work.
NE 92 in both directions: Between Patterson Street and NE 97.
...
Between Patterson Street and NE 97 (1 to 3 miles east of the Tryon area). Look out for construction work. The roadway is reduced to one lane. Look out for a flagging operation. A pilot car is in operation. Width limit 12'0" . Comment: Resurfacing
ReportedJune 18, 2026 at 05:17 AM PDTApril 7, 2030 at 04:02 AM PDT
Road
NE 92
Source
NDOT
Coordinates
41.54112, -100.91864
Roadworks details
Direction
BOTH_DIRECTIONS