RoadworksSevere
I-80 in both directions: Construction work.
I-80 in both directions: Between MM 262 and MM 265.
...
Between MM 262 and MM 265 (6 to 8 miles west of the Kearney area). Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Until November 30, 2026 at about 6:00PM CDT. Comment: Removing and replacing the existing pavement More Info: 20260605-D4-42852.pdf
ReportedJune 8, 2026 at 05:00 AM PDTNovember 30, 2026 at 04:00 PM PST
Road
I-80
Source
NDOT
Coordinates
40.67741, -99.27247
Roadworks details
Direction
BOTH_DIRECTIONS