RoadworksSevere
US 6 in both directions: Paving operations.
US 6 in both directions: Between Randolph Avenue and NE 46.
...
Between Randolph Avenue (Holbrook) and NE 46 (10 miles west of the Atlanta area). Paving operations. Milling work is in progress. Look out for bridge work. A lane is closed intermittently. Look out for flaggers. A pilot car is in operation. Portable traffic signals in use. Width limit 12'0". Comment: Work will include bridge work, ADA ramps in Arapahoe, asphalt milling, asphalt overlay, guardrail replacement and pavement marking More Info: Screenshot 2026-04-08 101205.jpg
ReportedApril 17, 2026 at 06:00 AM PDTJuly 28, 2030 at 05:50 AM PDT
Road
US 6
Source
NDOT
Coordinates
40.30691, -100.00726
Roadworks details
Direction
BOTH_DIRECTIONS