RoadworksSevere
US 20 in both directions: Construction work.
US 20 in both directions: Between Walnut Street and 577 Avenue.
...
Between Walnut Street (Laurel) and 577 Avenue (6 miles east of the Laurel area). Look out for construction work. The roadway is reduced to one lane. Portable traffic signals in use. Look out for flaggers. Width limit 12'0" . Comment: Weather permitting, work will begin June 1 on U.S. Highway 20. Work includes concrete patching, bridge replacement, bridge repair and asphalt pavement. Anticipated completion is late spring 2027
ReportedJune 1, 2026 at 05:30 AM PDTMarch 21, 2030 at 02:50 AM PDT
Road
US 20
Source
NDOT
Coordinates
42.42390, -97.10237
Roadworks details
Direction
BOTH_DIRECTIONS