RoadworksSevere
US 30 in both directions: Construction work.
US 30 in both directions: Between NE 39 and 280 Avenue.
...
Between NE 39 (Silver Creek) and 280 Avenue (Duncan). Look out for construction work. Width limit 12'0" . Comment: Work includes milling, asphalt, culvert, sidewalk with ADA upgrades and bridge work. Traffic will be controlled with temporary traffic signals and flaggers. There will be a 12-foot width restriction for the bridge work. Anticipated completion is fall 2026.
ReportedJune 1, 2026 at 05:00 AM PDTJune 14, 2030 at 06:29 AM PDT
Road
US 30
Source
NDOT
Coordinates
41.31307, -97.66939
Roadworks details
Direction
BOTH_DIRECTIONS