RoadworksSevere
I-80 eastbound: Bridge construction.
I-80 eastbound: Between MM 213 and Exit 222: Cozad.
Advertisement
...
Between MM 213 (near Gothenburg) and Exit 222: Cozad (near Cozad). Bridge construction work is in progress. Width limit 12'0" .
ReportedSeptember 6, 2026 at 10:00 PM PDTJune 26, 2030 at 07:20 PM PDT
Road
I-80
Source
NDOT
Coordinates
40.90480, -100.14214
Roadworks details
Direction
POSITIVE_DIRECTION