RoadworksSevere
US 75 southbound: Bridge construction.
US 75 southbound: Between Cornhusker Road and NE 370.
Advertisement
...
Between Cornhusker Road and NE 370 (near Bellevue). Bridge construction work is in progress. The roadway is reduced to one lane. Left lane closed in the southbound direction of travel.
ReportedMay 11, 2026 at 04:42 AM PDTJune 17, 2030 at 09:11 AM PDT
Road
US 75
Source
NDOT
Coordinates
41.14729, -95.93858
Roadworks details
Direction
NEGATIVE_DIRECTION