RoadworksSevere
I-180 in both directions: Bridge construction.
I-180 in both directions: Between US 34 and Exit 1: Superior Street.
...
Between US 34 and Exit 1: Superior Street (Lincoln). Bridge construction work is in progress. There is head to head traffic on the roadway. Width limit 12'0" . Speed limit 55 mph . Until December 31, 2027 at about 12:00AM CDT. Comment: Northbound I-180 traffic is shifted to head-to-head with southbound I-180 traffic at the I-80 and I-180 interchange. Concurrent with that traffic shift, the westbound I-80 to southbound I-180, eastbound I-80 to northbound I-180, and northbound I-180 to westbound I-80 loops will be closed. More Info: D1 I-180 Work.jpg | 079a9db1-996e-491d-aeae-4ef52fb65040.jpg
ReportedJuly 13, 2026 at 05:00 AM PDTDecember 30, 2027 at 10:00 PM PST
Road
I-180
Source
NDOT
Coordinates
40.86586, -96.71767
Roadworks details
Direction
BOTH_DIRECTIONS