RoadworksSevere
US 30 in both directions: Bridge construction.
US 30 in both directions: Between US 81 and 13th Street.
...
Between US 81 and 13th Street (near Columbus). Bridge construction work is in progress. Expect changing traffic patterns. Width limit 12'0" . Until November 30, 2027 at about 6:00PM CDT. Comment: Traffic will be switched, to a two-way, two-lane section in the northbound lanes.
ReportedApril 4, 2026 at 05:00 AM PDTNovember 30, 2027 at 04:00 PM PST
Road
US 30
Source
NDOT
Coordinates
41.41112, -97.36800
Roadworks details
Direction
BOTH_DIRECTIONS