LiveTrafik
RoadworksSevere

US 34 in both directions: Construction work.

US 34 in both directions: Between North 98th Street and North 134th Street.

...

Between North 98th Street and North 134th Street (near Walton). Look out for construction work. The roadway is reduced to one lane. Look out for a flagging operation. A pilot car is in operation. Speed limit 55 mph . Width limit 12'0" . Until September 30, 2026 at about 6:00PM CDT. Comment: Weather permitting, work will begin on Monday, August 24, 2026, on US-34, from reference post 332 to reference post 333, according to the Nebraska Department of Transportation. M.E. Collins of Wahoo, Nebraska is the contractor for this project. Work includes concrete pavement repair. Traffic will be maintained with flaggers and a pilot car. A 12-foot width restriction will be in effect. Anticipated completion is September 2026. More Info: Screenshot 2026-08-17 091420.png

ReportedAugust 24, 2026 at 04:00 AM PDTSeptember 30, 2026 at 04:00 PM PDT
Road
US 34
Source
NDOT
Coordinates
40.81308, -96.56878

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 34 in both directions: Construction work. | LiveTrafik