LiveTrafik
RoadworksModerate

US 75: Bridge construction.

US 75: Between US 400 and US 75 Business.

...

Between US 400 and US 75 Business (near Neodesha). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width restriction in effect . Width limit 12'0" . Until September 21, 2026 at about 11:59PM CDT.

ReportedJune 1, 2025 at 10:00 PM PDTSeptember 21, 2026 at 09:59 PM PDT
Road
US 75
Source
KDOT
Coordinates
37.41904, -95.67028

Roadworks details

Direction
NOT_DIRECTIONAL
🚧 Roadworks
US 75: Bridge construction. | LiveTrafik