RoadworksSevere
I-35 in both directions: Bridge construction.
I-35 in both directions: Between MM 57 and MM 59.
...
Between MM 57 and MM 59 (2 miles north of the Andover area). Bridge construction work is in progress. Width limit 12'0" . Speed limit 65 mph . Comment: Redeck / widen bridge 58.377.
ReportedMarch 16, 2026 at 03:00 AM PDTJanuary 2, 2030 at 11:20 PM PST
Road
I-35
Source
KDOT
Coordinates
37.71986, -97.11244
Roadworks details
Direction
BOTH_DIRECTIONS