LiveTrafik
RoadworksModerate

KS 4 in both directions: Bridge construction.

KS 4 in both directions: Between KS 99 and Shawnee County Line/Wabaunsee County Line.

...

Between KS 99 and Shawnee County Line/Wabaunsee County Line (3 miles east of the Eskridge area). Bridge construction work is in progress. A lane is closed. Automated traffic signals are in place. There is a width restriction in effect . Width limit 11'0" . Speed limit 35 mph . Vehicle length limit 60 ft . Until October 30, 2026 at about 11:00PM CDT. Comment: KS 4 in both directions, between KS 99 and Shawnee County Line/Wabaunsee County Line (3 miles east of the Eskridge area). Bridge construction work is in progress. A lane is closed. Automated traffic signals are in place. There is a width restriction in effect. Width limit 11'0". Speed limit 35 MPH. Vehicle length limit 60 ft. Until October 30, 2026 at about 11:00PM CDT.

ReportedMay 11, 2026 at 05:00 AM PDTOctober 30, 2026 at 09:00 PM PDT
Road
KS 4
Source
KDOT
Coordinates
38.91634, -96.08582

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
KS 4 in both directions: Bridge construction. | LiveTrafik