RoadworksModerate
KS 14: Bridge construction.
KS 14: Between Lincoln County Line/Mitchell County Line and US 24.
...
Between Lincoln County Line/Mitchell County Line and US 24 (Beloit). Bridge construction work is in progress. Width limit 12'0" . Comment: KS 14, between Lincoln County Line/Mitchell County Line and US 24 (Beloit). Bridge construction work is in progress. Width limit 12'0". Next update time 2:45 PM CDT, 5/27/26.
ReportedJanuary 11, 2026 at 10:00 PM PSTJune 21, 2030 at 08:33 AM PDT
Road
KS 14
Source
KDOT
Coordinates
39.45470, -98.10928
Roadworks details
Direction
NOT_DIRECTIONAL