LiveTrafik
RoadworksModerate

US 183 in both directions: Bridge construction.

US 183 in both directions: Between US 183 Bypass; I-70 and Ellis County Line/Rooks County Line.

...

Between US 183 Bypass; I-70 and Ellis County Line/Rooks County Line (8 miles south of the Plainville area). Bridge construction work is in progress. Portable traffic signals in use. The roadway is reduced to one lane. Width limit 17'0" . Expect 5 - min delays. Until October 30, 2026 at about 11:59PM CDT. Full schedule below: β€’ August 4, 1:00PM - October 30, 12:00AM Comment: Bridge construction work is in progress on US Highway 183 on the Saline River bridge near mile marker 169. Portable traffic signals are in use. Roadway is reduced to one lane. Width restriction is 17 feet. Construction will occur from August 4 to October 30, 2026.

ReportedAugust 4, 2026 at 11:00 AM PDTOctober 30, 2026 at 09:59 PM PDT
Road
US 183
Source
KDOT
Coordinates
39.09612, -99.30603

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 183 in both directions: Bridge construction. | LiveTrafik