RoadworksModerate

US 24 in both directions: Road construction.

US 24 in both directions: Between Graham County Line/Sheridan County Line and US 283.

Advertisement
...

Between Graham County Line/Sheridan County Line (4 miles west of the Morland area) and US 283 (Hill City). Road construction work is in progress because the road is being repaved. The roadway is reduced to one lane. Look out for a flagging operation. A pilot car is in operation . Expect 15 - min delays . Width limit 14'0" . Until October 9, 2026 at about 11:59PM CDT. Comment: US Highway 24 between the Graham County/Sheridan County Line (4 miles west of the Morland area) and US 283 (Hill City) is under road construction work due to paving operations. Look out for a flagger and pilot car operation. Expect 15 - minute delays. Construction starts September 8, 2026, and will last until around October 9, 2026.

ReportedSeptember 8, 2026 at 10:00 PM PDTOctober 9, 2026 at 09:59 PM PDT
Road
US 24
Source
KDOT
Coordinates
39.35476, -100.16256

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 24

🚧 Roadworks