LiveTrafik
RoadworksModerate

US 54 westbound: Bridge construction.

US 54 westbound: At Exit ramp to I-135 S.

...

At Exit ramp to I-135 S. Bridge construction work is in progress. The left shoulder is closed. The right shoulder is closed. There is a width restriction in effect . Width limit 15'0" . Speed limit 50 mph . Until September 3, 2027 at about 11:59PM CDT. Full schedule below: β€’ December 10, 2025, 12:00AM - September 3, 2027, 12:00AM

ReportedDecember 9, 2025 at 10:00 PM PSTSeptember 3, 2027 at 09:59 PM PDT
Road
US 54
Source
KDOT
Coordinates
37.67978, -97.31419

Roadworks details

Direction
NEGATIVE_DIRECTION
🚧 Roadworks
US 54 westbound: Bridge construction. | LiveTrafik