RoadworksMinor
US 81 in both directions: Construction work.
US 81 in both directions: Between KS 18 and KS 41.
...
Between KS 18 and KS 41 (1 mile south of the Minneapolis area). Look out for construction work.
ReportedApril 20, 2026 at 06:00 AM PDTFebruary 7, 2030 at 02:20 AM PST
Road
US 81
Source
KDOT
Coordinates
39.11173, -97.66070
Roadworks details
Direction
BOTH_DIRECTIONS