RoadworksModerate
KS 63: Construction work.
KS 63: Between US 36 and Nebraska State Line.
...
Between US 36 and Nebraska State Line (6 to 8 miles north of the Seneca area). Look out for construction work because a lane is closed. Bridge construction work is in progress. Width limit 11'0" . Advisory speed limit 45 mph . Until October 30, 2026 at about 7:00AM CDT. Comment: Bridge construction. Traffic guided through work zone via traffic signal.
ReportedOctober 6, 2025 at 05:00 AM PDTOctober 30, 2026 at 05:00 AM PDT
Road
KS 63
Source
KDOT
Coordinates
39.96110, -96.05242
Roadworks details
Direction
NOT_DIRECTIONAL