RoadworksModerate
US 56: Road construction.
US 56: Between KS 156 and KS 14.
...
Between KS 156 (near Ellinwood) and KS 14 (near Lyons). Road construction work is in progress. The road is being repaved. Look out for a flagging operation. Width limit 12'0" .
ReportedAugust 2, 2026 at 10:00 PM PDTMay 22, 2030 at 07:20 PM PDT
Road
US 56
Source
KDOT
Coordinates
38.35347, -98.56293
Roadworks details
Direction
NOT_DIRECTIONAL