RoadworksSevere
US 59 in both directions: Road construction.
US 59 in both directions: Between US 56 and US 40; KS 10.
...
Between US 56 and US 40; KS 10 (near Lawrence). Road construction work is in progress. The shoulder is closed. Until September 25, 2026 at about 11:59PM CDT. Comment: US 59 in both directions, between US 56 and US 40; KS 10 (near Lawrence). Road construction work is in progress. The shoulder is closed.
ReportedApril 20, 2026 at 05:00 AM PDTSeptember 25, 2026 at 09:59 PM PDT
Road
US 59
Source
KDOT
Coordinates
38.90692, -95.26041
Roadworks details
Direction
BOTH_DIRECTIONS