RoadworksModerate
KS 63: Bridge construction.
KS 63: Between US 24 and KS 16.
...
Between US 24 and KS 16 (near Emmett). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. There is a width restriction in effect . Width limit 12'0" . Speed limit 25 mph . Full schedule below: β’ July 29, 1:00AM - November 26, 12:00AM Comment: KS 63, between US 24 and KS 16 (near Emmett). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. There is a width restriction in effect. Width limit 12'0". Speed limit 25 MPH
ReportedOctober 8, 2026 at 01:21 PM PDTJuly 28, 2030 at 10:41 AM PDT
Road
KS 63
Source
KDOT
Coordinates
39.31838, -96.06341
Roadworks details
Direction
NOT_DIRECTIONAL