LiveTrafik
RoadworksModerate

KS 156 in both directions: Bridge construction.

KS 156 in both directions: Between US 50 and KS 23.

...

Between US 50 and KS 23 (18 to 19 miles east of the Garden City area). Bridge construction work is in progress. Width limit 12'0" . Until December 18, 2026 at about 11:59PM CDT. Comment: This project is a bridge replacement. A shoo-fly detour will be used to move traffic through the project during construction. Reduced speeds will be posted and there will also be a 12 ft width restriction in place.

ReportedMay 4, 2025 at 10:00 PM PDTDecember 18, 2026 at 09:59 PM PST
Road
KS 156
Source
KDOT
Coordinates
38.05942, -100.51844

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
KS 156 in both directions: Bridge construction. | LiveTrafik