LiveTrafik
RoadworksModerate

I-70 in both directions: Bridge construction.

I-70 in both directions: Between KS 247 and US 183 Bypass.

...

Between KS 247 and US 183 Bypass (4 miles east of the Ellis area). Bridge construction work is in progress. The roadway is reduced to one lane. Width limit 13'0" . Until September 18, 2026 at about 11:59PM CDT. Full schedule below: β€’ July 1, 12:00AM - September 18, 12:00AM Comment: Bridges on I-70 in both directions near mile marker 150, 4.2 miles east of Ellis are under construction. Roadway is reduced to one lane. Width restriction is 13 feet. Construction will occur from May 5 to September 18, 2026.

ReportedMay 4, 2026 at 10:00 PM PDTSeptember 18, 2026 at 09:59 PM PDT
Road
I-70
Source
KDOT
Coordinates
38.93864, -99.48485

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
I-70 in both directions: Bridge construction. | LiveTrafik