RoadworksModerate
US 24 in both directions: Construction work.
US 24 in both directions: Between US 75 and KS 4.
...
Between US 75 and KS 4 (Topeka). Look out for construction work. Look out for long term road construction work. There are alternating lane closures. Speed limit 35 mph . Comment: US-24 both EB & WB have continued construction work in the area.
ReportedSeptember 2, 2026 at 04:48 AM PDTJune 22, 2030 at 02:08 AM PDT
Road
US 24
Source
KDOT
Coordinates
39.09103, -95.66126
Roadworks details
Direction
BOTH_DIRECTIONS