US 30 in both directions (Mile Point 47.91 - 57.74): Paving operations.
US 30 in both directions: Between N 300 E and Union Rd.
Between N 300 E (2 miles west of the Hamlet area) and Union Rd (4 miles west of the Plymouth area). The road is being repaved. The left lane is closed. There is a width limit in effect . Speed restrictions are in force. Speed limit 45 mph . Width limit 10'0" . Until November 26, 2026 at about 5:00PM CDT. Comment: US 30 in both directions, INDOT Contract R-43901 between N 300 E (2 miles west of the Hamlet area) and Union Rd (4 miles west of the Plymouth area). There is a width limit in effect. Speed restrictions are in force. The left lane is closed. Speed limit 45 MPH. Width limit 10'0". Starting April 7, 2026 at about 7:00AM CDT until November 26, 2026 at about 5:00PM CDT. Traffic will continue to merge into the left lane in both directions. Beginning April 27, 2026, East bound Traffic will use the temporary crossover to enter the West Bound Passing Lane. Traffic will be maintained in both directions in the West Bound Lanes of US 30 while the East Bound Lanes are closed for construction. No Left Turns will be permitted off of US 30 in either direction during construction. During the first phase, access from US 35 to US 30 east bound will be maintained until later in the season when the ramp will be closed 3 weeks for repairs For more information call INDOT @ 1855-463-6848