I-80 westbound (Mile Point 4.9 - 6.44): Bridge construction.

I-80 westbound: Between Burr St and IN 912.

...

Between Burr St and IN 912 (Gary). Bridge construction work is in progress. The left lane of the exit ramp is closed. The right shoulder is closed. Until September 28, 2026 at about 6:00AM CDT. Comment: I-80 westbound, between Burr St and IN 912 (Gary). Bridge construction work is in progress. The left lane of the exit ramp is closed. The right shoulder of the mainline West Bound I 80/94 is closed. Starting July 27, 2026 at about 6:00AM CDT until August 27, 2026 at about 6:00AM CDT. Contract B-44198

ReportedJuly 27, 2026 at 12:00 AM PDTSeptember 28, 2026 at 04:00 AM PDT