LiveTrafik
RoadworksModerate

I-65 in both directions (Mile Point 213.75 - 216.65): Bridge construction.

I-65 in both directions: Between W 600 S and S 1000 W.

...

Between W 600 S (near Rensselaer) and S 1000 W (1 mile north of the Rensselaer area). Bridge construction work is in progress. Until October 30, 2026 at about 11:59PM CDT. Comment: I-65 in both directions, between W 600 S (near Rensselaer) and S 1000 W (1 mile north of the Rensselaer area). Bridge construction work is in progress. Reduced speed is in effect. Until October 30, 2026 at about 11:59PM CDT.

ReportedJuly 22, 2026 at 08:07 AM PDTOctober 30, 2026 at 09:59 PM PDT
Road
I-65
Source
INDOT
Coordinates
40.92627, -87.21811

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
I-65 in both directions (Mile Point 213.75 - 216.65): Bridge construction. | LiveTrafik